In early May crews came to dig the new basement...
They installed drywall in the bathroom upstairs and started to construct the extension on the back of the house....
By the middle of the month there was a door to the new basement, window wells, and some other structural stuff....
It finally stopped raining enough to pour the concrete for the basement....
The bathroom started to look more finished with the bathtub tile complete, the bathtub in (NO MORE BLACK BATHTUB!!!), tile on the floor, and a few changes to make the room feel bigger.
| Love the contrast of the dark tile and the white bathtub and tile |
| Closet depth shortened |
| Ceiling used to have a curve to it. The nice higher ceiling makes the room feel bigger. |
Then towards the end of the month, the new extensions went up for both the back of the kitchen and the new family room on top of the new basement.
| Check out how open that is from the kitchen to the new family room! |
| The new wider opening from the family room into the dining room |
| New basement! |
Can't wait to see what changes the next month will bring!
5 comments:
Oh my goodness, this will be SO NICE when it is done! ALL THAT SPACE! <3 <3 <3
xox
This is going to look amazing!
It looks beautiful, even all unfinished like this! I can just see what it will look like when it's polished up and done. LOVE the bathroom choices. Huge fan of white cabinets/tubs with dark floor. The tile is gorgeous! Oh, the rain...the rain... that must have set you back a bit. Glad the concrete is poured and things are moving along nicely!
Oh wow! It's going to be amazing!
Wow- So much progress in such a short time! It's going to look incredible!
Post a Comment